In order to achieve the purpose of pre-commissioning of the above mentioned subject title, this section describes what operations will be carried out and how it will occur. PROCEDURES: 5.1 PRE-COMMISSIONING AND START UP SATR-P-3402 – HVAC System – Energized Functional Testing & Motor Four Hour Run Test.ĥ. SATR-J-6602 – Instrument Cable – Continuity, Insulation Resistance(lnstalled) and Termination Torque Testing. SAIC-J-6606 – Instrument Cable – Installation, Termination, Identification and Pre-Commissioning – SATIP-J-902-01 – Metallic Instrumentation and Control Cable IV Quality Requirements for the Construction Phase – SAES-P-104 – Wiring Methods and Materials – SAES-J-902 – Electrical System for Instrumentation And ensure proper coordination with other services. Ensure that the system is functional according to the approved drawings and design specifications. – Assigned for the task shall be fully responsible in applying this method and make sure that it is followed with. – Give specific attention to all safety measure and quality control in coordination with HSE Manager, QA/QC Manager and in line with Approved HSE Plan and Approved Quality Plan. – Assigned particular responsibilities and authorities to construction personnel. – Coordinate with the Owner Representative, Commissioning Engineer, HSE Manager and QA/QC Manager for the safe and proper execution of the work. The method statement should outline the hazards involved and include a step by step guide on how to do the job safely. A work method statement, sometimes called a “safe system of work”, is a document that details the way a work task or process is to be completed.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |